Tamar Yacht Club Attenuator

Client: Tamar Yacht Club

Project value: $800,000

BC provided condition assessment of TYCs marina and attenuator post wave event damage and developed recommendations for a new custom steel barge attenuator utilising TYCs existing infrastructure and available piles retained post removal of the damaged attenuator.  Works included wave modelling, structural design for attenuator, piles, pile brackets and connections.  The attenuator was successfully installed in 2012 and functioning to the design standards for the Beauty Point Marina.